Was informed last night that the general contractor finished doing what was needed in the bathroom at the house and even took some preventative measures and updated some of the plumbing as well.
From what I was able to gather outside of a couple smol jobs, they'll be able to start leveling out the floor and work at installing it here in the next week or so
