due to the incident taking place in the early morning, the operator, unbeknownst to their coworkers and management, had become eepy. as a result, the operator was not fully cognizant of the correct sequence for introducing and stirring chemical reagents.
at 9:12 AM pacific time, the operator added dry powdered creamer-flavor compound to the reactor vessel. the operator then introduced two shots of fresh espresso, followed by two additional shots a minute later. up until this point, all had gone well, but they were about to make a crucial mistake.
at 9:15 AM, without realizing they had skipped the critical step of stirring the creamer-flavor compound into the hot espresso, the operator introduced cold milk