i have everything for the server rebuild except for the CPU heatsink, the refurb RTX2060, and two (out of a total of five) hard drives.
the CPU heatsink I have no idea when it's showing up. the remainder of the drives is tomorrow or friday and the 2060 is next week sometime.
I just realized I never ordered the RAM.
I think I intended to just take the sticks out of the old machine but both machines need to be up at the same time while I set up the new one and let the file transfers run

